NEXPERIA BUK9207-30B,118
NEXPERIA BUK9207-30B,118

NEXPERIA BUK9207-30B,118

Manufacturer No:

BUK9207-30B,118

Manufacturer:

NEXPERIA

Package:

TO-252-3, DPak (2 Leads + Tab), SC-63

Description:

MOSFET (Metal Oxide) N-Channel Tape & Reel (TR) 5m ? @ 25A, 10V ±15V 3430pF @ 25V 31nC @ 5V TO-252-3, DPak (2 Leads + Tab), SC-63

Delivery:

DHL
DHL
DHL
DHL

Payment:

DHL
DHL
DHL
DHL
DHL
DHL

In Stock :Available

Price not displayed? Please send an RFQ, and we will respond immediately.

BUK9207-30B,118 information

NEXPERIA BUK9207-30B,118 technical specifications, attributes, parameters and parts with similar specifications to NEXPERIA BUK9207-30B,118.

  • Type
  • Parameter
  • Factory Lead Time
  • 26 Weeks
  • Contact Plating
  • Tin
  • Mounting Type
  • Surface Mount
  • Package / Case
  • TO-252-3, DPak (2 Leads + Tab), SC-63
  • Surface Mount
  • YES
  • Number of Pins
  • 3
  • Transistor Element Material
  • SILICON
  • Operating Temperature
  • -55°C~185°C TJ
  • Packaging
  • Tape & Reel (TR)
  • Series
  • Automotive, AEC-Q101, TrenchMOS?
  • Published
  • 2010
  • JESD-609 Code
  • e3
  • Part Status
  • Active
  • Moisture Sensitivity Level (MSL)
  • 1 (Unlimited)
  • Number of Terminations
  • 2
  • ECCN Code
  • EAR99
  • Technology
  • MOSFET (Metal Oxide)
  • Terminal Form
  • GULL WING
  • Pin Count
  • 3
  • JESD-30 Code
  • R-PSSO-G2
  • Number of Elements
  • 1
  • Power Dissipation-Max
  • 167W Tc
  • Element Configuration
  • Single
  • Operating Mode
  • ENHANCEMENT MODE
  • Case Connection
  • DRAIN
  • Turn On Delay Time
  • 19 ns
  • FET Type
  • N-Channel
  • Transistor Application
  • SWITCHING
  • Rds On (Max) @ Id, Vgs
  • 5m ? @ 25A, 10V
  • Vgs(th) (Max) @ Id
  • 2V @ 1mA
  • Input Capacitance (Ciss) (Max) @ Vds
  • 3430pF @ 25V
  • Current - Continuous Drain (Id) @ 25°C
  • 75A Tc
  • Gate Charge (Qg) (Max) @ Vgs
  • 31nC @ 5V
  • Rise Time
  • 82ns
  • Drive Voltage (Max Rds On,Min Rds On)
  • 5V 10V
  • Vgs (Max)
  • ±15V
  • Fall Time (Typ)
  • 107 ns
  • Turn-Off Delay Time
  • 100 ns
  • Continuous Drain Current (ID)
  • 112A
  • JEDEC-95 Code
  • TO-252AA
  • Gate to Source Voltage (Vgs)
  • 15V
  • Max Dual Supply Voltage
  • 30V
  • Drain Current-Max (Abs) (ID)
  • 75A
  • Drain-source On Resistance-Max
  • 0.0077Ohm
  • Drain to Source Breakdown Voltage
  • 30V
  • Pulsed Drain Current-Max (IDM)
  • 424A
  • Radiation Hardening
  • No

Download datasheets and manufacturer documentation for NEXPERIA BUK9207-30B,118.

BUK9207-30B,118 Overview


A device's maximal input capacitance is 3430pF @ 25V, which is defined as the capacitance between its input terminals with either input grounded.This device's continuous drain current (ID) is 112A, which represents the maximum continuous current it can conduct.In this device, the drain-source breakdown voltage is 30V and the drain-source breakdown voltage is the VDS at which a specified value of ID flows.In this device, the drain current is 75A, which is the maximum continuous current the device can conduct.Its turn-off delay time is 100 ns, which is the time to charge the device's input capacitance before drain current conduction begins.In terms of pulsed drain current, it has a maximum of 424A, which is its maximum rated peak drain current.Input capacitance charging takes time before drain current conduction begins, so the turn-on delay time is 19 ns.Gate-source voltage, or VGS, is the voltage across a FET transistor's gate-source terminal, and can be 15V volts.By using 30V, it can supply the maximum voltage from two sources.This device reduces its overall power consumption by using drive voltage (5V 10V).

BUK9207-30B,118 Features


a continuous drain current (ID) of 112A
a drain-to-source breakdown voltage of 30V voltage
the turn-off delay time is 100 ns
based on its rated peak drain current 424A.


BUK9207-30B,118 Applications


There are a lot of Nexperia USA Inc.
BUK9207-30B,118 applications of single MOSFETs transistors.


  • Consumer Appliances
  • Lighting
  • Uninterruptible Power Supply
  • AC-DC Power Supply
  • Synchronous Rectification for ATX 1 Server I Telecom PSU
  • Motor drives and Uninterruptible Power Supplies
  • Micro Solar Inverter
  • DC/DC converters
  • Power Tools
  • Motor Drives and Uninterruptible Power Supples

User Guide

PURCHASE

Please verify all part numbers, quantities, and packaging preferences before placing your order. If substitutions are acceptable, please indicate this clearly. For time-sensitive projects, confirm estimated delivery dates and stock availability in advance. Once submitted, changes or cancellations may not be possible, especially for items marked as non-cancellable/non-returnable (NCNR). For international shipments, please ensure all import documentation is complete and accurate to avoid delays.

MEANS OF PAYMENT

For your convenience, we accept multiple payment methods in USD, including PayPal, Credit Card, and Wire Transfer. Net terms may be available for qualified customers upon approval.

RFQ (REQUEST FOR QUOTATIONS)

Please ensure the part numbers and quantities are accurate and complete when submitting your RFQ.
Provide target prices and acceptable alternatives, if any, to speed up the quotation process.

IMPORTANT NOTICE

Quotations are subject to stock availability and may vary with market conditions. Prices and lead times are not guaranteed until a purchase order is confirmed. Ensure your contact details are correct to avoid delays in response.

Step1:Prepare product

Step1:Prepare product

Step2:Desiccant Protection

Step2:Desiccant Protection

Step3:Vacuum Packaging

Step3:Vacuum Packaging

Step4:Individual Package

Step4:Individual Package

Step5:Anti-collision Filling

Step5:Anti-collision Filling

Step6:Packaging Box

Step6:Packaging Box

SHIPPING COST

1. Shipping starts at $40, but some countries will exceed $40. For example (South Africa, Brazil, India, Pakistan, Israel, etc.).
2. Some specific products need to reach the minimum order quantity.
3. It may cost additional remote fees for delivery if you are in a remote area.

SHIPPING METHOD

Currently, our products are shipped through DHL, FedEx, SF, and UPS.

DELIVERY TIME

1. Once the goods are shipped, estimated delivery time depends on the shipping methods you chose: FedEx International, 5-7 business days.
2. For in-stock parts, orders normally could be shipped out within 1-2days.