1. Home
  2. Integrated Circuits - ICs
  3. Power Management ICs
  4. BA25BC0FP-E2

In Stock :Available

Looking for price or availability? Send us an RFQ and our sales team will respond quickly.

checkAuthentic Components
checkFast Global Shipping
checkESD & IEC Compliance
checkFull Traceability

Shipping & Availability

DHL
EMS
FedEx
UPS

Fast worldwide shipping via DHL, FedEx, UPS, and EMS.

Shipped from:HK Warehouse
Expected Shipping:Sat, Nov 21 - Sun, Nov 22, 2026
Lead Time:Inquire about availability
Date Code:Within 2 Years

Payment

PayPal
MasterCard
Visa
American Express

We support multiple secure payment methods including PayPal, Visa, MasterCard, and American Express. All transactions are protected with advanced encryption to ensure secure and reliable payments.

Authenticity Guarantee

All components supplied by Aichiplink are sourced from trusted global suppliers and verified through strict in-house inspection and quality control procedures.

Quality Assurance

Certified in-house inspection and testing facilities ensure all components meet internationally recognized quality standards.

User Guide

Certified Quality & Compliance
Purchase & Inquiry
Package
Shipping Information

Available from AS9120 Certified Supplier, AIChipLink delivers high-reliability electronic components supported by certified quality management, rigorous inspection processes, counterfeit mitigation controls, and full traceability systems. Our operations comply with AS9120, ISO 9001:2015, and IECQ ESD standards to support aerospace, industrial, defense, and mission-critical applications.

AIChipLink – Your Trusted Electronic Components Distributor

Step1

12.28 M

Listed Part Number
Step1

3,000+

Leading Manufacturers
Step1

4.9 M

In-stock SKU
Step1

15,000+

Warehouse Area(㎡)
ROHM BA25BC0FP-E2
ROHM BA25BC0FP-E2

ROHM BA25BC0FP-E2

Manufacturer No:

BA25BC0FP-E2

Manufacturer:

ROHM

Package:

TO-252-3, DPak (2 Leads + Tab), SC-63

Description:

Fixed Copper, Tin BA25BC0 PMIC 4 TO-252-3, DPak (2 Leads + Tab), SC-63


Quantity:

DHL
DHL
DHL

BA25BC0FP-E2 Information

Specifications
Documents & Media
Product Details

ROHM BA25BC0FP-E2 technical specifications, attributes, parameters and parts with similar specifications to ROHM BA25BC0FP-E2.

  • Type
  • Parameter
  • Factory Lead Time
  • 6 Weeks
  • Contact Plating
  • Copper, Tin
  • Mount
  • Surface Mount
  • Mounting Type
  • Surface Mount
  • Package / Case
  • TO-252-3, DPak (2 Leads + Tab), SC-63
  • Number of Pins
  • 3
  • Operating Temperature
  • -40°C~105°C
  • Packaging
  • Tape & Reel (TR)
  • Published
  • 2005
  • Pbfree Code
  • yes
  • Type
  • Parameter
  • Part Status
  • Active
  • Moisture Sensitivity Level (MSL)
  • 1 (Unlimited)
  • Number of Terminations
  • 2
  • ECCN Code
  • EAR99
  • Subcategory
  • Other Regulators
  • Packing Method
  • TAPE AND REEL
  • Max Power Dissipation
  • 1.2W
  • Technology
  • BIPOLAR
  • Terminal Position
  • SINGLE
  • Terminal Form
  • GULL WING

BA25BC0FP-E2 FAQ

Can I request a quote for BA25BC0FP-E2?

BA25BC0FP-E2 from ROHM is ready for RFQ submission. Send your target quantity and requirements, and AIChipLink will check current availability, lead time, and quantity-based pricing.

Why is pricing not shown as a fixed value for BA25BC0FP-E2?

The final price for BA25BC0FP-E2 depends on requested quantity, supply conditions, date code, package option, and destination. An RFQ lets us return the current market quote for your order.

Which specifications should I review for BA25BC0FP-E2?

BA25BC0FP-E2 is a ROHM Power Management ICs part. Key details include Packaging: Tape & Reel (TR) and Moisture Sensitivity Level (MSL): 1 (Unlimited) and Current - Quiescent (Iq): 0.5mA; contact us if you need the specifications verified before sourcing.

When will I receive a quotation for BA25BC0FP-E2?

After you submit the RFQ for BA25BC0FP-E2, our sales team typically replies within 24 hours with availability, unit pricing, lead time, shipping choices, and possible substitutes.

What is the expected shipping time for BA25BC0FP-E2?

Once stock for BA25BC0FP-E2 is confirmed, available inventory can generally ship within 1–2 business days. The final schedule depends on quantity, warehouse source, and delivery address.

Can AIChipLink help find alternatives to BA25BC0FP-E2?

Yes. If BA25BC0FP-E2 is unavailable, end-of-life, or outside your schedule, we can review comparable ROHM Power Management ICs parts and compatible replacement options.

BA25BC0FP-E2 Relevant information

Hot Sale
Popular Search
ROHM BD3930FP-E2

BD3930FP-E2

ROHM

ROHM BU4338F-TR

BU4338F-TR

ROHM

ROHM BA78M24FP-E2

BA78M24FP-E2

ROHM

ROHM BD49L47G-TL

BD49L47G-TL

ROHM

ROHM BD45411G-TR

BD45411G-TR

ROHM

ROHM BU4228G-TR

BU4228G-TR

ROHM

ROHM BU46K454G-TL

BU46K454G-TL

ROHM

ROHM BD49K51G-TL

BD49K51G-TL

ROHM

ROHM BD5344G-TR

BD5344G-TR

ROHM

ROHM BU45K362G-TL

BU45K362G-TL

ROHM

AIChipLink

info@aichiplink.com

+86 075582712476

FacebookLinkedinInstagramX

Company

About UsQuality ControlContact Us

Resources

CategoriesManufacturerRequest a Quote

Payment

Payment
Payment
Payment
Payment

Shipping

Shipping
Shipping
Shipping
Shipping

Copyright © 2025 Power by AIChiplink Limited

Privacy Policy
Terms & Conditions
Cookies Policy
Refund & Return Policy
Shipping & Delivery Policy

Contact Us

Email Us: info@aichiplink.comCall Us: +86 075582712476Feedback

Follow Us

FacebookLinkedinInsX

Company

About UsContact Us

Resources

CategoriesManufacturer
Request a Quote

Payment

Payment
Payment
Payment
Payment

Shipping

Shipping
Shipping
Shipping
Shipping

Copyright © 2025 Power by AIChiplink Limited

Privacy Policy
Terms & Conditions
Cookies Policy
Refund & Return Policy
Shipping & Delivery Policy
  • AIChipLink
    • Input keywords/ Part number
    • Manufacturers
    • Hot ProductsHot Products
    • RFQ
    • Quality Control
    • Tools
    • About Us
    • Input keywords/ Part number