Renesas NP100N04PUK-E1-AY
Manufacturer No:
NP100N04PUK-E1-AY
Manufacturer:
Package:
TO-263-4, D2Pak (3 Leads + Tab), TO-263AA
Description:
MOSFET (Metal Oxide) N-Channel Tube 2.3m ? @ 50A, 10V ±20V 7050pF @ 25V 120nC @ 10V 40V TO-263-4, D2Pak (3 Leads + Tab), TO-263AA
Quantity:
Delivery:




Payment:







In Stock :Available
Price not displayed? Please send an RFQ, and we will respond immediately.
NP100N04PUK-E1-AY information
Renesas NP100N04PUK-E1-AY technical specifications, attributes, parameters and parts with similar specifications to Renesas NP100N04PUK-E1-AY.
- Type
- Parameter
- Factory Lead Time
- 16 Weeks
- Mount
- Surface Mount
- Mounting Type
- Surface Mount
- Package / Case
- TO-263-4, D2Pak (3 Leads + Tab), TO-263AA
- Operating Temperature
- 175°C TJ
- Packaging
- Tube
- Published
- 2011
- Part Status
- Active
- Moisture Sensitivity Level (MSL)
- 1 (Unlimited)
- Technology
- MOSFET (Metal Oxide)
- Pin Count
- 3
- Power Dissipation-Max
- 1.8W Ta 176W Tc
- Turn On Delay Time
- 28 ns
- FET Type
- N-Channel
- Rds On (Max) @ Id, Vgs
- 2.3m ? @ 50A, 10V
- Input Capacitance (Ciss) (Max) @ Vds
- 7050pF @ 25V
- Current - Continuous Drain (Id) @ 25°C
- 100A Tc
- Gate Charge (Qg) (Max) @ Vgs
- 120nC @ 10V
- Rise Time
- 14ns
- Drain to Source Voltage (Vdss)
- 40V
- Drive Voltage (Max Rds On,Min Rds On)
- 10V
- Vgs (Max)
- ±20V
- Fall Time (Typ)
- 10 ns
- Turn-Off Delay Time
- 70 ns
- Gate to Source Voltage (Vgs)
- 20V
- Radiation Hardening
- No
- RoHS Status
- RoHS Compliant
Download datasheets and manufacturer documentation for Renesas NP100N04PUK-E1-AY.
ConflictMineralStatement:
NP100N04PUK-E1-AY Overview
Op amps with either input grounded have a fixed input capacitance parameter, CI, and this device has a 7050pF @ 25V maximal input capacitance.Devices can conduct a maximum continuous current of 3 amps in the drain area, so the continuous drain current (ID) for this device is 100A amps.It is [70 ns] because it takes time to charge the input capacitance of the device before drain current conduction can begin.A turn-on delay time of 28 ns indicates the time it takes for the input capacitance of the device to charge before drain current conduction starts.Generally, the gate-source voltage (VGS) of a FET transistor is the voltage across its gate-source terminal, which is 20V.To operate this transistor, you will need a 40V drain to source voltage (Vdss).A device like this reduces its overall power consumption when it uses drive voltage (10V).
NP100N04PUK-E1-AY Features
a continuous drain current (ID) of 100A
the turn-off delay time is 70 ns
a 40V drain to source voltage (Vdss)
NP100N04PUK-E1-AY Applications
There are a lot of Renesas Electronics America
NP100N04PUK-E1-AY applications of single MOSFETs transistors.
- Synchronous Rectification for ATX 1 Server I Telecom PSU
- Motor drives and Uninterruptible Power Supplies
- Micro Solar Inverter
- DC/DC converters
- Power Tools
- Motor Drives and Uninterruptible Power Supples
- Synchronous Rectification
- Battery Protection Circuit
- Telecom 1 Sever Power Supplies
- Industrial Power Supplies
User Guide
Please verify all part numbers, quantities, and packaging preferences before placing your order. If substitutions are acceptable, please indicate this clearly. For time-sensitive projects, confirm estimated delivery dates and stock availability in advance. Once submitted, changes or cancellations may not be possible, especially for items marked as non-cancellable/non-returnable (NCNR). For international shipments, please ensure all import documentation is complete and accurate to avoid delays.
MEANS OF PAYMENTFor your convenience, we accept multiple payment methods in USD, including PayPal, Credit Card, and Wire Transfer. Net terms may be available for qualified customers upon approval.
RFQ (REQUEST FOR QUOTATIONS)Please ensure the part numbers and quantities are accurate and complete when submitting your RFQ.
Provide target prices and acceptable alternatives, if any, to speed up the quotation process.
Quotations are subject to stock availability and may vary with market conditions. Prices and lead times are not guaranteed until a purchase order is confirmed. Ensure your contact details are correct to avoid delays in response.

Step1:Prepare product

Step2:Desiccant Protection

Step3:Vacuum Packaging

Step4:Individual Package

Step5:Anti-collision Filling

Step6:Packaging Box
1. Shipping starts at $40, but some countries will exceed $40. For example (South Africa, Brazil, India, Pakistan, Israel, etc.).
2. Some specific products need to reach the minimum order quantity.
3. It may cost additional remote fees for delivery if you are in a remote area.
Currently, our products are shipped through DHL, FedEx, SF, and UPS.
DELIVERY TIME1. Once the goods are shipped, estimated delivery time depends on the shipping methods you chose: FedEx International, 5-7 business days.
2. For in-stock parts, orders normally could be shipped out within 1-2days.
NP100N04PUK-E1-AY Relevant information
The following parts are popular search parts in Integrated Circuits (ICs).
AIChipLink – Your Trusted Electronic Components Distributor
12.28 M
Listed Part Number3,000+
Leading Manufacturers4.9 M
In-stock SKU15,000+
Warehouse Area(㎡)

