Multicomp MC36213
Multicomp MC36213

Multicomp MC36213

Manufacturer No:

MC36213

Manufacturer:

Multicomp

Package:

SMD/SMT

Description:

Cut Tape SMD/SMT

Delivery:

DHL
DHL
DHL
DHL

Payment:

DHL
DHL
DHL
DHL
DHL
DHL

In Stock :Available

Price not displayed? Please send an RFQ, and we will respond immediately.

MC36213 information

Multicomp MC36213 technical specifications, attributes, parameters and parts with similar specifications to Multicomp MC36213.

  • Type
  • Parameter
  • Package / Case
  • SMD/SMT
  • Packaging
  • Cut Tape
  • Published
  • 2011
  • Max Operating Temperature
  • 85°C
  • Min Operating Temperature
  • -40°C
  • Voltage - Rated DC
  • 6V
  • Case Code (Metric)
  • 2012
  • Case Code (Imperial)
  • 0805
  • Operating Supply Voltage
  • 6V
  • Voltage
  • 6V
  • Hold Current
  • 500mA
  • Current Rating (Max)
  • 100A
  • Max Supply Voltage (DC)
  • 6V
  • Time to Trip
  • 100 ms
  • Trip Current
  • 1A
  • REACH SVHC
  • Unknown
  • RoHS Status
  • RoHS Compliant

Download datasheets and manufacturer documentation for Multicomp MC36213.

MC36213 Overview


To prevent damage to the PTC thermistors, they are packaged in SMD/SMT packages. PTC thermistors are packaged in the Cut Tape as a safety measure. Temperature -40°C is the minimum operating temperature for PTC thermistors. This thermistor must not operate above 85°C in order for it to work. A PTC thermistor could provide 6V voltage when operating. When this thermistor is functioning, it can provide 6V. thermistors have been rated for 6V in DC circuits. It is not recommended that PTC thermistors operate above 100A current. A DC circuit shouldn't exceed 6V with this thermistor.

MC36213 Features


Package / Case: SMD/SMT


MC36213 Applications


There are a lot of Multicomp
MC36213 PTC Thermistors applications.


  • Building automation
  • Thermal threshold detection
  • Motor control
  • Chargers
  • Thermal protection of winding in electric motors
  • Secondary protection of battery packs
  • Limit temperature monitoring
  • Over-temperature protection of power components
  • DC/DC converters
  • SMPS

User Guide

PURCHASE

Please verify all part numbers, quantities, and packaging preferences before placing your order. If substitutions are acceptable, please indicate this clearly. For time-sensitive projects, confirm estimated delivery dates and stock availability in advance. Once submitted, changes or cancellations may not be possible, especially for items marked as non-cancellable/non-returnable (NCNR). For international shipments, please ensure all import documentation is complete and accurate to avoid delays.

MEANS OF PAYMENT

For your convenience, we accept multiple payment methods in USD, including PayPal, Credit Card, and Wire Transfer. Net terms may be available for qualified customers upon approval.

RFQ (REQUEST FOR QUOTATIONS)

Please ensure the part numbers and quantities are accurate and complete when submitting your RFQ.
Provide target prices and acceptable alternatives, if any, to speed up the quotation process.

IMPORTANT NOTICE

Quotations are subject to stock availability and may vary with market conditions. Prices and lead times are not guaranteed until a purchase order is confirmed. Ensure your contact details are correct to avoid delays in response.

Step1:Prepare product

Step1:Prepare product

Step2:Desiccant Protection

Step2:Desiccant Protection

Step3:Vacuum Packaging

Step3:Vacuum Packaging

Step4:Individual Package

Step4:Individual Package

Step5:Anti-collision Filling

Step5:Anti-collision Filling

Step6:Packaging Box

Step6:Packaging Box

SHIPPING COST

1. Shipping starts at $40, but some countries will exceed $40. For example (South Africa, Brazil, India, Pakistan, Israel, etc.).
2. Some specific products need to reach the minimum order quantity.
3. It may cost additional remote fees for delivery if you are in a remote area.

SHIPPING METHOD

Currently, our products are shipped through DHL, FedEx, SF, and UPS.

DELIVERY TIME

1. Once the goods are shipped, estimated delivery time depends on the shipping methods you chose: FedEx International, 5-7 business days.
2. For in-stock parts, orders normally could be shipped out within 1-2days.