ADI LTC3525ESC6-3#TRMPBF
ADI LTC3525ESC6-3#TRMPBF

ADI LTC3525ESC6-3#TRMPBF

Manufacturer No:

LTC3525ESC6-3#TRMPBF

Manufacturer:

ADI

Package:

6-VSSOP, SC-88, SOT-363

Description:

6 Terminals 1V 6-Pin LTC3525 DC DC Voltage Regulator SWITCHING REGULATOR 1 Outputs Tape & Reel (TR) 65mA 6-VSSOP, SC-88, SOT-363

Delivery:

DHL
DHL
DHL
DHL

Payment:

DHL
DHL
DHL
DHL
DHL
DHL
DHL

In Stock :Available

Price not displayed? Please send an RFQ, and we will respond immediately.

LTC3525ESC6-3#TRMPBF information

ADI LTC3525ESC6-3#TRMPBF technical specifications, attributes, parameters and parts with similar specifications to ADI LTC3525ESC6-3#TRMPBF.

  • Type
  • Parameter
  • Lifecycle Status
  • PRODUCTION (Last Updated: 3 weeks ago)
  • Factory Lead Time
  • 8 Weeks
  • Mounting Type
  • Surface Mount
  • Package / Case
  • 6-VSSOP, SC-88, SOT-363
  • Surface Mount
  • YES
  • Number of Pins
  • 6
  • Operating Temperature
  • -40°C~85°C TA
  • Packaging
  • Tape & Reel (TR)
  • Published
  • 2010
  • JESD-609 Code
  • e3
  • Part Status
  • Active
  • Moisture Sensitivity Level (MSL)
  • 1 (Unlimited)
  • Number of Terminations
  • 6
  • ECCN Code
  • EAR99
  • Terminal Finish
  • Matte Tin (Sn)
  • Additional Feature
  • ALSO HAS PWM CONTROL TECHNIQUE
  • Subcategory
  • Switching Regulator or Controllers
  • Technology
  • CMOS
  • Terminal Position
  • DUAL
  • Terminal Form
  • GULL WING
  • Peak Reflow Temperature (Cel)
  • 260
  • Time@Peak Reflow Temperature-Max (s)
  • 30
  • Base Part Number
  • LTC3525
  • Function
  • Step-Up
  • Qualification Status
  • Not Qualified
  • Efficiency
  • 95 %
  • Voltage - Input (Max)
  • 4.5V
  • Output Voltage
  • 3V
  • Output Type
  • Fixed
  • Voltage - Input (Min)
  • 1V
  • Input Voltage-Nom
  • 1.2V
  • Analog IC - Other Type
  • SWITCHING REGULATOR
  • Output Configuration
  • Positive
  • Current - Output
  • 65mA
  • Topology
  • Boost
  • Control Mode
  • CURRENT-MODE
  • Control Technique
  • HYSTERETIC CURRENT MODE
  • Synchronous Rectifier
  • Yes
  • Min Output Voltage
  • 3V
  • Length
  • 2mm
  • RoHS Status
  • RoHS Compliant

Download datasheets and manufacturer documentation for ADI LTC3525ESC6-3#TRMPBF.

LTC3525ESC6-3#TRMPBF Overview


Using the Tape & Reel (TR) package, this voltage regulator optimizes the performance of the voltage regulator 12v. A voltage regulator consists of 6 terminations. There is a SWITCHING REGULATOR type analog IC in this voltage regulator 12v that is used to convey analog signals. There is a 6-VSSOP, SC-88, SOT-363 package available for this voltage regulator, as DC DC switching regulator is space-saving. 1 outputs have been configured in the voltage regulator 12v. On its output pins, this adjusting voltage regulator generates Fixed output. Switching regulators like this one can be mounted on the Surface Mount mounting system. In order for it to operate properly, dc to dc voltage regulator's operating temperature should be at -40°C~85°C TA. Regulator 1V can operate with dc to dc voltage regulator's minimum input voltage 1V. DC DC switching regulator's maximum design flexibility comes from its output current of 65mA. Voltage regulator's input voltage can reach 4.5V. A regulator with this 260 peak reflow temperature is essentially indestructible. For operation, switching regulator requires a nominal input voltage of 1.2V. There is a subcategory of this regulator voltage called Switching Regulator or Controllers. LTC3525 is a family of voltage regulators that belong to the DC/DC industry. Voltage regulator is capable of giving voltage at 3V volts. In order to operate voltage regulator, 6 pins are required. This voltage regulator 12v should be configured with an output voltage that is at least 3V. This harley voltage regulator is more efficient and stable due to its ALSO HAS PWM CONTROL TECHNIQUE feature.

LTC3525ESC6-3#TRMPBF Features


1 outputs
Peak reflow temperature (Cel) of 260
6 pins
ALSO HAS PWM CONTROL TECHNIQUE


LTC3525ESC6-3#TRMPBF Applications


There are a lot of Linear Technology/Analog Devices
LTC3525ESC6-3#TRMPBF Voltage Regulators applications.


  • Network technology
  • Automation technology
  • CMM
  • Various precision measuring instruments
  • Various precision measuring detectors
  • Flaw detection equipment
  • Balance equipment
  • Industrial robots
  • Industrial controllers
  • Die casting equipment

User Guide

PURCHASE

Please verify all part numbers, quantities, and packaging preferences before placing your order. If substitutions are acceptable, please indicate this clearly. For time-sensitive projects, confirm estimated delivery dates and stock availability in advance. Once submitted, changes or cancellations may not be possible, especially for items marked as non-cancellable/non-returnable (NCNR). For international shipments, please ensure all import documentation is complete and accurate to avoid delays.

MEANS OF PAYMENT

For your convenience, we accept multiple payment methods in USD, including PayPal, Credit Card, and Wire Transfer. Net terms may be available for qualified customers upon approval.

RFQ (REQUEST FOR QUOTATIONS)

Please ensure the part numbers and quantities are accurate and complete when submitting your RFQ.
Provide target prices and acceptable alternatives, if any, to speed up the quotation process.

IMPORTANT NOTICE

Quotations are subject to stock availability and may vary with market conditions. Prices and lead times are not guaranteed until a purchase order is confirmed. Ensure your contact details are correct to avoid delays in response.

Step1:Prepare product

Step1:Prepare product

Step2:Desiccant Protection

Step2:Desiccant Protection

Step3:Vacuum Packaging

Step3:Vacuum Packaging

Step4:Individual Package

Step4:Individual Package

Step5:Anti-collision Filling

Step5:Anti-collision Filling

Step6:Packaging Box

Step6:Packaging Box

SHIPPING COST

1. Shipping starts at $40, but some countries will exceed $40. For example (South Africa, Brazil, India, Pakistan, Israel, etc.).
2. Some specific products need to reach the minimum order quantity.
3. It may cost additional remote fees for delivery if you are in a remote area.

SHIPPING METHOD

Currently, our products are shipped through DHL, FedEx, SF, and UPS.

DELIVERY TIME

1. Once the goods are shipped, estimated delivery time depends on the shipping methods you chose: FedEx International, 5-7 business days.
2. For in-stock parts, orders normally could be shipped out within 1-2days.