Good-Ark GSGP0240SD
Good-Ark GSGP0240SD

Good-Ark GSGP0240SD

Manufacturer No:

GSGP0240SD

Manufacturer:

Good-Ark

Package:

Description:

Tape and Reel

Delivery:

DHL
DHL
DHL
DHL

Payment:

DHL
DHL
DHL
DHL
DHL
DHL

In Stock :Available

Price not displayed? Please send an RFQ, and we will respond immediately.

GSGP0240SD information

Good-Ark GSGP0240SD technical specifications, attributes, parameters and parts with similar specifications to Good-Ark GSGP0240SD.

  • Type
  • Parameter
  • ECCN (US)
  • EAR99
  • HTS
  • 8541.10.00.80
  • Maximum DC Reverse Voltage (V)
  • 40
  • Peak Reverse Repetitive Voltage (V)
  • 40
  • Maximum Continuous Forward Current (A)
  • 2
  • Peak Non-Repetitive Surge Current (A)
  • 40
  • Peak Forward Voltage (V)
  • 0.55
  • Peak Reverse Current (uA)
  • 100
  • Minimum Operating Temperature (°C)
  • -55
  • Maximum Operating Temperature (°C)
  • 150
  • Automotive
  • No
  • Supplier Package
  • SOD-323F
  • Military
  • No
  • Mounting
  • Surface Mount
  • Package Height
  • 1.08(Max)
  • Package Length
  • 2.2(Max)
  • Package Width
  • 1.6(Max)
  • PCB changed
  • 2
  • Packaging
  • Tape and Reel
  • Part Status
  • Active
  • Type
  • Schottky Diode
  • Pin Count
  • 2
  • Configuration
  • Single
  • RoHS Status
  • RoHS Compliant

Download datasheets and manufacturer documentation for Good-Ark GSGP0240SD.

GSGP0240SD Overview


The datasheets state that the peak forward voltage is 0.55.A continuous forward current of about 2 can be consumed by this device at any given time.In order to operate, you will need a DC reverse voltage less than 40.

GSGP0240SD Features


the forward peak voltage is 0.55


GSGP0240SD Applications


There are a lot of Good-Ark Semiconductor
GSGP0240SD applications of RF diodes.


  • RF detector
  • RF voltage doubler
  • Wearables
  • Smart metering
  • Set top boxes
  • RF attenuators and switches
  • Low-loss, high-power limiters
  • Receiver protectors
  • UHF mixer
  • Sampling circuits

User Guide

PURCHASE

Please verify all part numbers, quantities, and packaging preferences before placing your order. If substitutions are acceptable, please indicate this clearly. For time-sensitive projects, confirm estimated delivery dates and stock availability in advance. Once submitted, changes or cancellations may not be possible, especially for items marked as non-cancellable/non-returnable (NCNR). For international shipments, please ensure all import documentation is complete and accurate to avoid delays.

MEANS OF PAYMENT

For your convenience, we accept multiple payment methods in USD, including PayPal, Credit Card, and Wire Transfer. Net terms may be available for qualified customers upon approval.

RFQ (REQUEST FOR QUOTATIONS)

Please ensure the part numbers and quantities are accurate and complete when submitting your RFQ.
Provide target prices and acceptable alternatives, if any, to speed up the quotation process.

IMPORTANT NOTICE

Quotations are subject to stock availability and may vary with market conditions. Prices and lead times are not guaranteed until a purchase order is confirmed. Ensure your contact details are correct to avoid delays in response.

Step1:Prepare product

Step1:Prepare product

Step2:Desiccant Protection

Step2:Desiccant Protection

Step3:Vacuum Packaging

Step3:Vacuum Packaging

Step4:Individual Package

Step4:Individual Package

Step5:Anti-collision Filling

Step5:Anti-collision Filling

Step6:Packaging Box

Step6:Packaging Box

SHIPPING COST

1. Shipping starts at $40, but some countries will exceed $40. For example (South Africa, Brazil, India, Pakistan, Israel, etc.).
2. Some specific products need to reach the minimum order quantity.
3. It may cost additional remote fees for delivery if you are in a remote area.

SHIPPING METHOD

Currently, our products are shipped through DHL, FedEx, SF, and UPS.

DELIVERY TIME

1. Once the goods are shipped, estimated delivery time depends on the shipping methods you chose: FedEx International, 5-7 business days.
2. For in-stock parts, orders normally could be shipped out within 1-2days.