TOSHIBA 7UL1G02FU,LF
TOSHIBA 7UL1G02FU,LF

TOSHIBA 7UL1G02FU,LF

Manufacturer No:

7UL1G02FU,LF

Manufacturer:

TOSHIBA

Package:

5-TSSOP, SC-70-5, SOT-353

Description:

Gates & Inverters 0.9V~3.6V V

Delivery:

DHL
DHL
DHL
DHL

Payment:

DHL
DHL
DHL
DHL
DHL
DHL
DHL

In Stock :Available

Price not displayed? Please send an RFQ, and we will respond immediately.

7UL1G02FU,LF information

TOSHIBA 7UL1G02FU,LF technical specifications, attributes, parameters and parts with similar specifications to TOSHIBA 7UL1G02FU,LF.

  • Type
  • Parameter
  • Factory Lead Time
  • 12 Weeks
  • Mounting Type
  • Surface Mount
  • Package / Case
  • 5-TSSOP, SC-70-5, SOT-353
  • Operating Temperature
  • -40°C~85°C
  • Packaging
  • Tape & Reel (TR)
  • Series
  • 7UL
  • Part Status
  • Active
  • Moisture Sensitivity Level (MSL)
  • 1 (Unlimited)
  • Voltage - Supply
  • 0.9V~3.6V
  • Number of Circuits
  • 1
  • Number of Inputs
  • 2
  • Current - Output High, Low
  • 8mA 8mA
  • Logic Type
  • NOR Gate
  • Max Propagation Delay @ V, Max CL
  • 4.4ns @ 3.3V, 30pF
  • Logic Level - Low
  • 0.1V ~ 0.4V
  • Logic Level - High
  • 0.75V ~ 2.48V
  • Current - Quiescent (Max)
  • 1?A
  • RoHS Status
  • RoHS Compliant

Download datasheets and manufacturer documentation for TOSHIBA 7UL1G02FU,LF.

7UL1G02FU,LF Overview


The part comes in 5-TSSOP, SC-70-5, SOT-353 packaging, which makes it convenient to ship overseas. To ensure high reliability, a new packaging method Tape & Reel (TR) is used. A NOR Gate logic principle is used to make it work. It is necessary to ensure the full functionality of the part by providing a voltage of 0.9V~3.6V. Around -40°C~85°C is the extended operating temperature. There is a hole in Surface Mount for mounting the part. In both high and low states, output current is 8mA 8mA. This item is from the 7UL series. Inputs for this part are 2. Circuits number 1 make up this device. Standing by mode draws 1?A watts of current.

7UL1G02FU,LF Features


NOR Gate Logic Type
Operating Temperature: -40°C~85°C


7UL1G02FU,LF Applications


There are a lot of Toshiba Semiconductor and Storage
7UL1G02FU,LF Gates and Inverters applications.


  • Computer
  • Television
  • Washing machine
  • Range hood
  • Refrigerator
  • VCR
  • Massager
  • Fan
  • Illumination
  • Cell phone

User Guide

PURCHASE

Please verify all part numbers, quantities, and packaging preferences before placing your order. If substitutions are acceptable, please indicate this clearly. For time-sensitive projects, confirm estimated delivery dates and stock availability in advance. Once submitted, changes or cancellations may not be possible, especially for items marked as non-cancellable/non-returnable (NCNR). For international shipments, please ensure all import documentation is complete and accurate to avoid delays.

MEANS OF PAYMENT

For your convenience, we accept multiple payment methods in USD, including PayPal, Credit Card, and Wire Transfer. Net terms may be available for qualified customers upon approval.

RFQ (REQUEST FOR QUOTATIONS)

Please ensure the part numbers and quantities are accurate and complete when submitting your RFQ.
Provide target prices and acceptable alternatives, if any, to speed up the quotation process.

IMPORTANT NOTICE

Quotations are subject to stock availability and may vary with market conditions. Prices and lead times are not guaranteed until a purchase order is confirmed. Ensure your contact details are correct to avoid delays in response.

Step1:Prepare product

Step1:Prepare product

Step2:Desiccant Protection

Step2:Desiccant Protection

Step3:Vacuum Packaging

Step3:Vacuum Packaging

Step4:Individual Package

Step4:Individual Package

Step5:Anti-collision Filling

Step5:Anti-collision Filling

Step6:Packaging Box

Step6:Packaging Box

SHIPPING COST

1. Shipping starts at $40, but some countries will exceed $40. For example (South Africa, Brazil, India, Pakistan, Israel, etc.).
2. Some specific products need to reach the minimum order quantity.
3. It may cost additional remote fees for delivery if you are in a remote area.

SHIPPING METHOD

Currently, our products are shipped through DHL, FedEx, SF, and UPS.

DELIVERY TIME

1. Once the goods are shipped, estimated delivery time depends on the shipping methods you chose: FedEx International, 5-7 business days.
2. For in-stock parts, orders normally could be shipped out within 1-2days.