Renesas 2SK3431-AZ
Renesas 2SK3431-AZ

Renesas 2SK3431-AZ

Manufacturer No:

2SK3431-AZ

Manufacturer:

Renesas

Package:

TO-220-3

Description:

MOSFET (Metal Oxide) N-Channel Tube 5.6m ? @ 42A, 10V ±20V 6100pF @ 10V 110nC @ 10V 40V TO-220-3

Delivery:

DHL
DHL
DHL
DHL

Payment:

DHL
DHL
DHL
DHL
DHL
DHL
DHL

In Stock :Available

Price not displayed? Please send an RFQ, and we will respond immediately.

2SK3431-AZ information

Renesas 2SK3431-AZ technical specifications, attributes, parameters and parts with similar specifications to Renesas 2SK3431-AZ.

  • Type
  • Parameter
  • Factory Lead Time
  • 16 Weeks
  • Mount
  • Through Hole
  • Mounting Type
  • Through Hole
  • Package / Case
  • TO-220-3
  • Number of Pins
  • 3
  • Transistor Element Material
  • SILICON
  • Operating Temperature
  • 150°C TJ
  • Packaging
  • Tube
  • Published
  • 2002
  • Part Status
  • Obsolete
  • Moisture Sensitivity Level (MSL)
  • 1 (Unlimited)
  • Number of Terminations
  • 3
  • ECCN Code
  • EAR99
  • HTS Code
  • 8541.29.00.95
  • Subcategory
  • FET General Purpose Power
  • Technology
  • MOSFET (Metal Oxide)
  • Terminal Position
  • SINGLE
  • Peak Reflow Temperature (Cel)
  • 260
  • Time@Peak Reflow Temperature-Max (s)
  • NOT SPECIFIED
  • Pin Count
  • 3
  • Qualification Status
  • Not Qualified
  • Number of Elements
  • 1
  • Configuration
  • SINGLE WITH BUILT-IN DIODE
  • Power Dissipation-Max
  • 1.5W Ta 100W Tc
  • Case Connection
  • DRAIN
  • Turn On Delay Time
  • 120 ns
  • FET Type
  • N-Channel
  • Transistor Application
  • SWITCHING
  • Rds On (Max) @ Id, Vgs
  • 5.6m ? @ 42A, 10V
  • Input Capacitance (Ciss) (Max) @ Vds
  • 6100pF @ 10V
  • Current - Continuous Drain (Id) @ 25°C
  • 83A Tc
  • Gate Charge (Qg) (Max) @ Vgs
  • 110nC @ 10V
  • Rise Time
  • 1.8?s
  • Drain to Source Voltage (Vdss)
  • 40V
  • Drive Voltage (Max Rds On,Min Rds On)
  • 4V 10V
  • Vgs (Max)
  • ±20V
  • Fall Time (Typ)
  • 440 ns
  • Turn-Off Delay Time
  • 350 ns
  • Continuous Drain Current (ID)
  • 83A
  • JEDEC-95 Code
  • TO-220AB
  • Gate to Source Voltage (Vgs)
  • 20V
  • Drain-source On Resistance-Max
  • 0.0089Ohm
  • DS Breakdown Voltage-Min
  • 40V
  • RoHS Status
  • RoHS Compliant

Download datasheets and manufacturer documentation for Renesas 2SK3431-AZ.

2SK3431-AZ Overview


Input capacitance, CI, is defined as the capacitance between two input terminals of an op amp with one input grounded, and the input capacitance of this device is 6100pF @ 10V.This device has a continuous drain current (ID) of [83A], which is its maximum continuous current.The turn-off delay time of a device is the time it takes to charge its input capacitance before drain current can flow. The turn-off delay time of a device is 350 ns.During turn-on, the input capacitance of the device is charged before drain current conduction starts, so its delay time is 120 ns.Gate-source voltage, or VGS, is the voltage across a FET transistor's gate-source terminal, and can be 20V volts.In order to maintain normal operation, it is recommended to keep the DS breakdown voltage above 40V.In order to operate this transistor, a voltage of 40V is needed from the drain to the source (Vdss).Its overall power consumption can be reduced by using drive voltage (4V 10V).

2SK3431-AZ Features


a continuous drain current (ID) of 83A
the turn-off delay time is 350 ns
a 40V drain to source voltage (Vdss)


2SK3431-AZ Applications


There are a lot of Renesas Electronics America
2SK3431-AZ applications of single MOSFETs transistors.


  • Uninterruptible Power Supply
  • AC-DC Power Supply
  • Synchronous Rectification for ATX 1 Server I Telecom PSU
  • Motor drives and Uninterruptible Power Supplies
  • Micro Solar Inverter
  • DC/DC converters
  • Power Tools
  • Motor Drives and Uninterruptible Power Supples
  • Synchronous Rectification
  • Battery Protection Circuit

User Guide

PURCHASE

Please verify all part numbers, quantities, and packaging preferences before placing your order. If substitutions are acceptable, please indicate this clearly. For time-sensitive projects, confirm estimated delivery dates and stock availability in advance. Once submitted, changes or cancellations may not be possible, especially for items marked as non-cancellable/non-returnable (NCNR). For international shipments, please ensure all import documentation is complete and accurate to avoid delays.

MEANS OF PAYMENT

For your convenience, we accept multiple payment methods in USD, including PayPal, Credit Card, and Wire Transfer. Net terms may be available for qualified customers upon approval.

RFQ (REQUEST FOR QUOTATIONS)

Please ensure the part numbers and quantities are accurate and complete when submitting your RFQ.
Provide target prices and acceptable alternatives, if any, to speed up the quotation process.

IMPORTANT NOTICE

Quotations are subject to stock availability and may vary with market conditions. Prices and lead times are not guaranteed until a purchase order is confirmed. Ensure your contact details are correct to avoid delays in response.

Step1:Prepare product

Step1:Prepare product

Step2:Desiccant Protection

Step2:Desiccant Protection

Step3:Vacuum Packaging

Step3:Vacuum Packaging

Step4:Individual Package

Step4:Individual Package

Step5:Anti-collision Filling

Step5:Anti-collision Filling

Step6:Packaging Box

Step6:Packaging Box

SHIPPING COST

1. Shipping starts at $40, but some countries will exceed $40. For example (South Africa, Brazil, India, Pakistan, Israel, etc.).
2. Some specific products need to reach the minimum order quantity.
3. It may cost additional remote fees for delivery if you are in a remote area.

SHIPPING METHOD

Currently, our products are shipped through DHL, FedEx, SF, and UPS.

DELIVERY TIME

1. Once the goods are shipped, estimated delivery time depends on the shipping methods you chose: FedEx International, 5-7 business days.
2. For in-stock parts, orders normally could be shipped out within 1-2days.