ADI LTC6994CDCB-2#TRMPBF
ADI LTC6994CDCB-2#TRMPBF

ADI LTC6994CDCB-2#TRMPBF

Manufacturer No:

LTC6994CDCB-2#TRMPBF

Manufacturer:

ADI

Package:

6-WFDFN Exposed Pad

Description:

2.5/5V 0°C~70°C Multi-Functional Gate TimerBlox® Series LTC6994 6 Pin 0.5mm 3.3V 6-WFDFN Exposed Pad

Delivery:

DHL
DHL
DHL
DHL

Payment:

DHL
DHL
DHL
DHL
DHL
DHL

In Stock :Available

Price not displayed? Please send an RFQ, and we will respond immediately.

LTC6994CDCB-2#TRMPBF information

ADI LTC6994CDCB-2#TRMPBF technical specifications, attributes, parameters and parts with similar specifications to ADI LTC6994CDCB-2#TRMPBF.

  • Type
  • Parameter
  • Lifecycle Status
  • PRODUCTION (Last Updated: 1 month ago)
  • Factory Lead Time
  • 8 Weeks
  • Mount
  • Surface Mount
  • Mounting Type
  • Surface Mount
  • Package / Case
  • 6-WFDFN Exposed Pad
  • Number of Pins
  • 6
  • Operating Temperature
  • 0°C~70°C
  • Packaging
  • Tape & Reel (TR)
  • Series
  • TimerBlox®
  • Published
  • 2011
  • JESD-609 Code
  • e3
  • Part Status
  • Active
  • Moisture Sensitivity Level (MSL)
  • 1 (Unlimited)
  • Number of Terminations
  • 6
  • ECCN Code
  • EAR99
  • Terminal Finish
  • Matte Tin (Sn)
  • Subcategory
  • Delay Lines
  • Technology
  • CMOS
  • Voltage - Supply
  • 2.25V~5.5V
  • Terminal Position
  • DUAL
  • Terminal Form
  • NO LEAD
  • Peak Reflow Temperature (Cel)
  • 260
  • Supply Voltage
  • 3.3V
  • Terminal Pitch
  • 0.5mm
  • Base Part Number
  • LTC6994
  • Function
  • Programmable
  • Qualification Status
  • Not Qualified
  • Supply Voltage-Max (Vsup)
  • 5.5V
  • Power Supplies
  • 2.5/5V
  • Supply Voltage-Min (Vsup)
  • 2.25V
  • Output Polarity
  • TRUE
  • Logic IC Type
  • SILICON DELAY LINE
  • Power Supply Current-Max (ICC)
  • 0.2mA
  • Number of Taps/Steps
  • 8
  • Number of Independent Delays
  • 1
  • Programmable Delay Line
  • YES
  • Available Total Delays
  • 1?s ~ 33.6s
  • Length
  • 3mm
  • Width
  • 2mm
  • REACH SVHC
  • No SVHC
  • RoHS Status
  • ROHS3 Compliant

Download datasheets and manufacturer documentation for ADI LTC6994CDCB-2#TRMPBF.

LTC6994CDCB-2#TRMPBF Overview


In order to minimize costs, Tape & Reel (TR) is used to package it. In applications requiring insulating hardware, the 6-WFDFN Exposed Pad package is able to eliminate the need for this. This is due to the supply voltage of 2.25V~5.5V, which ensures reliable performance. It is mounted using the Surface Mount technique. The operating temperature of this unit is 0°C~70°C. As configured, it has taps and steps of 8. The use of multiple related parts with the same base part number LTC6994 is universally preferred for a wide variety of applications. There are two terminals at DUAL. The system is equipped with 6 terminations for a unique configuration. During operation, 3.3V is provided with a supply voltage. There is a logic type SILICON DELAY LINE used in it. This technology was developed as a result of the advanced CMOS technology. Delay Lines provides all the benefits of its subcategory. It is acceptable to operate with a minimum supply voltage of 2.25V. With a maximum supply voltage of 5.5V, it is acceptable to operate it. Surface Mount mounted in the way. The power supply of 2.5/5V is designed so that it can operate in a flexible manner. The design of the device is based on the use of 6 pins. An important electronic device of the TimerBlox® series, it belongs to this group.

LTC6994CDCB-2#TRMPBF Features


Supply voltage at Tape & Reel (TR) volts
operate supply current at 3.3V
with SILICON DELAY LINE bits
supply type: 2.5/5V
Mounting Type: TimerBlox®


LTC6994CDCB-2#TRMPBF Applications


There are a lot of Linear Technology/Analog Devices
LTC6994CDCB-2#TRMPBF Delay Lines Timing ICs applications.


  • Utility Meters
  • Security Systems
  • Network Hubs, Bridges, and Routers
  • QDR/QDRII Memory Systems
  • Multiphase Clock Generation
  • LCD Televisions
  • Telecommunications
  • Digital Test Equipment
  • Digital Video Projection
  • Signal Generators and Analyzers

User Guide

PURCHASE

Please verify all part numbers, quantities, and packaging preferences before placing your order. If substitutions are acceptable, please indicate this clearly. For time-sensitive projects, confirm estimated delivery dates and stock availability in advance. Once submitted, changes or cancellations may not be possible, especially for items marked as non-cancellable/non-returnable (NCNR). For international shipments, please ensure all import documentation is complete and accurate to avoid delays.

MEANS OF PAYMENT

For your convenience, we accept multiple payment methods in USD, including PayPal, Credit Card, and Wire Transfer. Net terms may be available for qualified customers upon approval.

RFQ (REQUEST FOR QUOTATIONS)

Please ensure the part numbers and quantities are accurate and complete when submitting your RFQ.
Provide target prices and acceptable alternatives, if any, to speed up the quotation process.

IMPORTANT NOTICE

Quotations are subject to stock availability and may vary with market conditions. Prices and lead times are not guaranteed until a purchase order is confirmed. Ensure your contact details are correct to avoid delays in response.

Step1:Prepare product

Step1:Prepare product

Step2:Desiccant Protection

Step2:Desiccant Protection

Step3:Vacuum Packaging

Step3:Vacuum Packaging

Step4:Individual Package

Step4:Individual Package

Step5:Anti-collision Filling

Step5:Anti-collision Filling

Step6:Packaging Box

Step6:Packaging Box

SHIPPING COST

1. Shipping starts at $40, but some countries will exceed $40. For example (South Africa, Brazil, India, Pakistan, Israel, etc.).
2. Some specific products need to reach the minimum order quantity.
3. It may cost additional remote fees for delivery if you are in a remote area.

SHIPPING METHOD

Currently, our products are shipped through DHL, FedEx, SF, and UPS.

DELIVERY TIME

1. Once the goods are shipped, estimated delivery time depends on the shipping methods you chose: FedEx International, 5-7 business days.
2. For in-stock parts, orders normally could be shipped out within 1-2days.