rubycon 16YXG330MEFCT78X9
rubycon 16YXG330MEFCT78X9

rubycon 16YXG330MEFCT78X9

Manufacturer No:

16YXG330MEFCT78X9

Manufacturer:

rubycon

Package:

Radial, Can

Description:

YXG 330?F Capacitor ±20% Tape & Box (TB) Through Hole 0.315Dia 8.00mm -40°C~105°C Polar 3.5052mm Radial, Can

Delivery:

DHL
DHL
DHL
DHL

Payment:

DHL
DHL
DHL
DHL
DHL
DHL

In Stock :Available

Price not displayed? Please send an RFQ, and we will respond immediately.

16YXG330MEFCT78X9 information

rubycon 16YXG330MEFCT78X9 technical specifications, attributes, parameters and parts with similar specifications to rubycon 16YXG330MEFCT78X9.

  • Type
  • Parameter
  • Factory Lead Time
  • 18 Weeks
  • Mount
  • Through Hole
  • Mounting Type
  • Through Hole
  • Package / Case
  • Radial, Can
  • Operating Temperature
  • -40°C~105°C
  • Packaging
  • Tape & Box (TB)
  • Series
  • YXG
  • Published
  • 2015
  • Size / Dimension
  • 0.315Dia 8.00mm
  • Tolerance
  • ±20%
  • Part Status
  • Active
  • Moisture Sensitivity Level (MSL)
  • 1 (Unlimited)
  • Applications
  • General Purpose
  • Voltage - Rated
  • 16V
  • Capacitance
  • 330?F
  • Lead Pitch
  • 3.5052mm
  • Lead Spacing
  • 0.138 3.50mm
  • Lifetime @ Temp
  • 4000 Hrs @ 105°C
  • Polarization
  • Polar
  • Life (Hours)
  • 4000 hours
  • Height Seated (Max)
  • 0.413 10.50mm
  • RoHS Status
  • RoHS Compliant

Download datasheets and manufacturer documentation for rubycon 16YXG330MEFCT78X9.

16YXG330MEFCT78X9 Overview


You should keep the seated height (Max) below 0.413 10.50mm.When operating at -40°C~105°C, high efficiency can be achieved.

16YXG330MEFCT78X9 Features


an operating temperature of -40°C~105°C


16YXG330MEFCT78X9 Applications


There are a lot of Rubycon
16YXG330MEFCT78X9 applications of aluminum electrolytic capacitors.


  • Power supplies
  • Computer motherboards
  • Uninterruptible power supplies
  • Frequency converters
  • Computer
  • Telecommunication
  • Industrial systems
  • Smoothing and filtering applications
  • Standard and switched mode power supplies
  • Energy storage in pulse systems

User Guide

PURCHASE

Please verify all part numbers, quantities, and packaging preferences before placing your order. If substitutions are acceptable, please indicate this clearly. For time-sensitive projects, confirm estimated delivery dates and stock availability in advance. Once submitted, changes or cancellations may not be possible, especially for items marked as non-cancellable/non-returnable (NCNR). For international shipments, please ensure all import documentation is complete and accurate to avoid delays.

MEANS OF PAYMENT

For your convenience, we accept multiple payment methods in USD, including PayPal, Credit Card, and Wire Transfer. Net terms may be available for qualified customers upon approval.

RFQ (REQUEST FOR QUOTATIONS)

Please ensure the part numbers and quantities are accurate and complete when submitting your RFQ.
Provide target prices and acceptable alternatives, if any, to speed up the quotation process.

IMPORTANT NOTICE

Quotations are subject to stock availability and may vary with market conditions. Prices and lead times are not guaranteed until a purchase order is confirmed. Ensure your contact details are correct to avoid delays in response.

Step1:Prepare product

Step1:Prepare product

Step2:Desiccant Protection

Step2:Desiccant Protection

Step3:Vacuum Packaging

Step3:Vacuum Packaging

Step4:Individual Package

Step4:Individual Package

Step5:Anti-collision Filling

Step5:Anti-collision Filling

Step6:Packaging Box

Step6:Packaging Box

SHIPPING COST

1. Shipping starts at $40, but some countries will exceed $40. For example (South Africa, Brazil, India, Pakistan, Israel, etc.).
2. Some specific products need to reach the minimum order quantity.
3. It may cost additional remote fees for delivery if you are in a remote area.

SHIPPING METHOD

Currently, our products are shipped through DHL, FedEx, SF, and UPS.

DELIVERY TIME

1. Once the goods are shipped, estimated delivery time depends on the shipping methods you chose: FedEx International, 5-7 business days.
2. For in-stock parts, orders normally could be shipped out within 1-2days.